ams CityDocks logo black
$

I'm interested

$

I'm interested

The new

standard for

urban logistics!

Introduction

AMS CityDocks is strategically located on the West side of Amsterdam and provides excellent accessibility with direct connections on highways A5 and A9, potentially reaching 2 million people in 30 minutes. Due to its proximity to the Amsterdam city center – which is just a 15 minutes’ drive – the location is very well suited for last mile purposes.

The development aims to set a new standard for urban logistics in the greater Amsterdam region and will be realized in accordance with the best in class specifications from both a constructive and sustainability perspective. The entire premises comprises a plot of 55,000 sqm with a 37,000 sqm multi-tenant urban logistics building in total, divided in city hubs starting at 2,300 sqm. All hubs will be delivered on a turnkey basis.

Flexible warehouse units starting

2,300

SQM

4 level parking garage providing

401

Parking spaces
332 in parking garage
37 in front of the building 32 van parking spaces

Available
as of

Q2

2025

USP’S AMS
CITYDOCKS

Brand-new building that is designed and will be constructed in accordance with the highest building standards

Flexible warehouse units starting at c. 2,300 sqm up to 28,000 sqm

Clear height of 10.4 m¹

Sufficient docks for both vans and trucks

5 MW power connection

Excellent accessibility by both car and public transport, with separated entrances and exits

Parking garage providing 401 spaces 332 in parking garage 37 in front of the building 32 van parking spaces

Unique location for both city logistics as regional distribution

Highly secured building due to water boundaries and gates

Future expansion possibilities

View all Technical Specifications

#
$

Location & Accessibility

Doing business close to the city of Amsterdam, is an international setting.

Business Park Amsterdam Osdorp is the business location of the future, due to its unique location: on the Logistics Corridor between Amsterdam Airport Schiphol and the Nieuw-West district of Amsterdam, in the middle of the Tuinen van West.

Get in touch

$

General

M

CLOSE

Steel building frame

Insulation value of RC=6.3 sqm K/W for the roof and RC=4.7 sqm K/W for the façades

Fire alarm and evacuation alarm, fire hoses, emergency lighting as per regulations. All in compliance with NEN 6079

Warehouse

Concrete floor load c. 5,000 kg/sqm (expedition c. 2,500 kg/sqm)

Floor flatness warehouse area, Din 18202 Zeile 4

Floor flatness expedition zone, Din 18202 Zeile 4

Racking point load c. 9,000 kg

Dock shelters with bumpers and wheel guides

Storage sprinklers, roof-net certified automatic sprinkler system (ESFR FM guidelines);

Free span of 22.8 m1 (column structure)

20 loading docks and 53 docks for box trucks

Electrically operated steel overhead doors at dock

Maximum clear height c. 10.4 m1 at storage area

11 electrically operated overhead doors at ground level (4.0 x 4.5 m1)

Sufficient number of 230V and 400V power connections

Sufficient (fluorescent) LED lighting (lux)

Site | Exterior

Highly secured building due to water boundaries and gates

4 entrances and exits for truck and van traffic as well as 2 separate entrances and exits for visitors and employees, all with electrically operating sliding gates

Loading pit is suitable for incoming and out coming standard European trucks

Parking garage for 32 vans and 332 parking spaces, including lift installation

37 parkings on own terrain in front of the office spaces

Paving with heavy-duty concrete bricks

6.500 solar panels providing 3 MW

Sufficient outdoor site lighting over loading pits

Offices

2 levels

Mechanical ventilation, fitted with air-conditioned ceiling cassettes

Suspended ceilings fitted with monitor friendly integrated (fluorescent) LED lighting

Cable ducts for data, phone and electricity

Fully equipped, separate male and female toilet sanitary facilities on each office floor

Fire alarm and evacuation alarm, fire hoses emergency lighting as per regulations