ams CityDocks logo black
$

I'm interested

$

I'm interested

The new

standard for

urban logistics!

The Building

AMS CityDocks is strategically located on the west side of Amsterdam and provides excellent accessibility to high ways A5 and A9, potentially reaching 2.5 million people within 30 minutes. Due to its proximity to the Amsterdam city center – which is just a 15 minutes’ drive- the location is very well suited for last mile purposes.

The building, constructed in 2024/2025, aims to set a new standard for urban logistics in the greater Amsterdam region and is realized in accordance with the best in class specifications from both a constructive and sustainability perspective. The entire complex comprises 35,970 sqm LFA multi-tenant warehouse space, mezzanine space and offices. Building B is fully leased to Medux B.V. Building A, totaling 23,361 sqm LFA,  is divided into 6 city hubs, starting at 2,371 sqm LFA warehouse space. All hubs are delivered on a turn key basis.

Building A:

23,361

SQM LFA in total and starting at

2,371

Parking spaces (building A)

232

196 car parking spaces
36 van parking spaces

Constructed in

2024/2025

USP’S AMS
CityDocks

Brand-new building designed and constructed in accordance with the highest building standards

Flexible warehouse units starting at 2,371 sqm LFA up to 18,224 sqm LFA

Max floor load of 50 Kn/m2, Clear height in the warehouse of 10.4 m

Building part A is equipped with 31 docks for vans and 16 docks for trucks (1 dock per 388 sqm warehouse)

4.25 MW power connection (expandable to 5MW) + 4.5 MW additional power via a pv-installation

Excellent accessibility by both car and public transport, with separated entrances and exits

Parking included for both cars and mini vans, including charging facilities

Unique location for both city logistics and regional distribution

Highly secured building due to water boundaries and gates

Multi tenant use including future expansion possibilities and flexible use

BREEAM Excellent rating

View all Technical Specifications

#
$

Availability

Discover your
new cityhub

Parking

Parking spaces situated in parking garage and on outside terrain: 427

376 car parking spaces
51 van parking spaces

Note

CityDocks 1 to 6 are also available as one unit.

The exact LFA (Lettable floor area) is determined in accordance with the NEN 2580.

Location & Accessibility

Doing business close to the city of Amsterdam, in an international setting.

Business Park Amsterdam Osdorp is the business location of the future, due to its unique location: on the Logistics Corridor between Amsterdam Airport Schiphol and the Nieuw-West district of Amsterdam, in the middle of the Tuinen van West.

Get in touch

$

General

M

CLOSE

Steel building frame

Insulation value of RC=6.3 sqm K/W for the roof and RC=4.7 sqm K/W for the façades

Fire alarm and evacuation alarm, fire hoses, emergency lighting as per regulations. All in compliance with NEN 6079

Warehouse

Concrete floor load c. 5,000 kg/sqm (expedition c. 2,500 kg/sqm)

Floor flatness warehouse area, Din 18202 Zeile 4

Floor flatness expedition zone, Din 18202 Zeile 4

Racking point load c. 9,000 kg

Dock shelters with bumpers and wheel guides

Storage sprinklers, roof-net certified automatic sprinkler system (ESFR FM guidelines);

Free span of 22.8 m1 (column structure)

20 loading docks and 53 docks for box trucks

Electrically operated steel overhead doors at dock

Maximum clear height c. 10.4 m1 at storage area

11 electrically operated overhead doors at ground level (4.0 x 4.5 m1)

Sufficient number of 230V and 400V power connections

Sufficient (fluorescent) LED lighting (lux)

Site | Exterior

Highly secured building due to water boundaries and gates

4 entrances and exits for truck and van traffic as well as 2 separate entrances and exits for visitors and employees, all with electrically operating sliding gates

Loading pit is suitable for incoming and out coming standard European trucks

Parking garage with 35 Van and 339 car parking spaces

37 parkings on own terrain in front of the office spaces

Paving with heavy-duty concrete bricks

Solar panels on the roof providing 4,5 MW

Sufficient outdoor site lighting over loading pits

Offices

2 levels

Mechanical ventilation, fitted with air-conditioned ceiling cassettes

Suspended ceilings fitted with monitor friendly integrated (fluorescent) LED lighting

Cable ducts for data, phone and electricity

Fully equipped, separate male and female toilet sanitary facilities on each office floor

Fire alarm and evacuation alarm, fire hoses emergency lighting as per regulations